|
Projects > Feasibility Studies > WPA Draft Report & SEIS
Draft Feasibility Report and Supplemental Environmental Impact Statement (SEIS):
Water Preserve Areas Feasibility Study
October 2001

The Draft Integrated Water Preserve Areas Feasibility Study and Supplemental Environmental Impact Statement have been released for review. The report may be downloaded below.
A copy of the report is available on CD by contacting Steve Sutterfield at 904-232-1104 (stephen.t.sutterfield@usace.army.mil) or Ms. Lucy Soto at 904-232-3921 lucy.soto@usace.army.mil. Copies of the report are also available at applicable county library systems, the South Florida Water Management District and its service centers.
|
 |
| Draft Feasibility Report and Supplemental Environmental Impact Statement (SEIS) |
Please Note: Some of the files listed below are very large.
7 Nov 2001 - Main Report
Summary (341 kb, PDF)
Introduction (1.4 mb, PDF)
Pre-drainage Condition (1.7 mb, PDF)
Existing Conditions* (3.7 mb, PDF)
Future Without Plan Condition (1 mb, PDF)
Problems and Opportunities (254 kb, PDF)
Plan Formulation & Evaluation (1.8 mb, PDF)
Environmental Effects* (365 kb, PDF)
Recommended Plan (1.5 mb, PDF)
Public Involvement* (239 kb, PDF)
Compliance with Environmental Reguirements* (212 kb, PDF)
Recommendations (95 kb, PDF)
List Of Study Team Members and Report Preparers* (525 kb, PDF)
Glossary (428 kb, PDF)
References* (121 kb, PDF)
Index* (133 kb, PDF)
Annexes (13 mb, PDF)
Complete Main Report (25 mb, PDF)
Appendices
Appendix A – Plan Formulation (6.3 mb, PDF)
Appendix B – Engineering Design (12 mb, PDF)
Plates for Appendix B (21 mb, PDF)
Appendix C – Geotechnical (10 mb, PDF)
Appendix D – Draft Water Control Plans (737 kb, PDF)
Appendix E – Cost Engineering (902 kb, PDF)
Appendix F – Real Estate Plan (1.5 mb, PDF)
Appendix G – Socio Economics (332 kb, PDF)
Appendix H – Water Quality (6.3 mb, PDF)
Appendix I – Florida Compliance Report (965 kb, PDF
* indicates sections required for NEPA compliance |
|
|
 |
| Public Comments |
Comments on this report were due by January 2, 2002. See below to download the Draft Public Comment and Responses to the Draft Feasibility Report and SEIS.
16 May 2002 - Draft Public Comment and Responses to the Draft Feasibility Report and SEIS (currently unavailable)
|
|
 |

|