CERP Project:
South Miami-Dade Reuse

share:

The purpose of the project is to provide additional water supply to the South Biscayne Bay and Coastal Wetlands Enhancement Project. Detailed analyses will be required to determine the quality and quantity of water needed to meet the ecological goals and objectives of Biscayne Bay. Superior water quality treatment features will be based on appropriate pollution load reduction targets necessary to protect downstream receiving surface waters.

This project includes a plant expansion to produce superior, advanced treatment of wastewater from the existing South District Wastewater Treatment Plant (WWTP) located north of the C-1 Canal in Miami-Dade County. In order to attain the superior level of treatment, construction of an add-on pretreatment and membrane treatment system to the existing secondary treatment facility will be necessary. An initial design of this feature assumed the plant would have a capacity of 131 million gallons per day.

Related Links & Project Documents:

  • No CERP documents are currently available for this project.

Project Contacts:

U.S. Army Corps of Engineers:

Pauline Acosta, Section Chief
Pauline.M.Acosta@usace.army.mil

Sponsor:

No designee at this time

Project Details:

Project Sponsor: Miami-Dade County
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
Project Phase: Pre-Construction, Engineering and Design
Design Agreement: Agreement Pending
CERP Component Designation: BBB
Project Cooperation Agreement:  
Authorization: Not currently authorized

 

 