CERP Project:
C-4 Control Structures
To enhance wetland hydroperiods and recharge to Miami-Dade County's Northwest Well Field, the new eastern structure will be operated to reduce regional system deliveries by diverting dry season stormwater flows to the C-2 Canal to provide salt-water intrusion protection and recharge to downstream well fields.
The existing western structure, being implemented under the E&SF Critical Projects (WRDA 1996) program, will be operated to control water levels in the C-4 Canal at a higher elevation to reduce seepage losses from the Pennsuco Wetlands and areas to the west of the structure.
Project Contacts:
U.S. Army Corps of Engineers:
Pauline Acosta, Section Chief
Pauline.M.Acosta@usace.army.mil
Sponsor:
Jorge Jaramillo, Project Manager
jjaramil@sfwmd.gov
Project Details:
| Project Sponsor: | South Florida Water Management District |
|---|---|
| Project Schedule: | For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP). |
| Project Phase: | Pre-Construction, Engineering and Design |
| Design Agreement: | 12 May 2000 |
| CERP Component Designation: | T |
| Project Cooperation Agreement: | |
| Authorization: | Not currently authorized |