Homepage
Programs Projects
Homepage CERP Projects Feasibility Studies Public Meetings Non-CERP Projects
     
 
Projects > C-4 Structure

C-4 Structure
headline dots

dots

Project Managers

U.S. Army Corps of Engineers Project Manager:
Jeff Couch
Jeffery.D.Couch@usace.army.mil

Sponsor Project Manager:
Jorge Jaramillo
jjaramil@sfwmd.gov

dots

Project Details

Project Sponsor: South Florida Water Management District
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
*Project Region: South
Project Phase: Pre-Construction, Engineering and Design
Design Agreement: 12 May 2000
CERP Component Designation: T
Project Cooperation Agreement:
Authorization: Not Currently Authorized
dots

Project Description

This component is a water control structure in the C-4 Canal just east of the intersection with the C-2 Canal in Miami-Dade County. The primary purpose of S-380E (C-4 Structure) is to divert water south into the C-2 Canal for ground water wellfield recharge. The ability to direct flows south into the C-2 Canal will provide more freshwater flows to the central Biscayne Bay area. The Structure can be operated to maximize the flow in both canals during the wet season to optimize flood protection. Although incidental, the possibility of improving flood protection of the C-4 basin is significant since flooding continues to be an issue for the surrounding communities.
dots

     
 
home  contact us   privacy & disclaimer   glossary   search