CERP Project:
Aquifer Storage and Recovery Regional Study
While the CERP Restudy did not directly call for an Aquifer Storage and Recovery (ASR) Regional Study, it was agreed that a coordinated central data collection and regional modeling effort was required to address the large-scale ASR implementation issues under the CERP. The study will investigate regional and technical issues governing the feasibility of full-scale ASR implementation; and its potential effect on water levels and water quality within the aquifer systems, and on existing water users, surface-water bodies, and the flora and fauna that inhabit them.
The ASR pilot facilities are the platforms used to conduct scientific and engineering studies addressing the uncertainties identified with using the technology at the scale envisioned under the CERP. Objectives of the ASR Regional Study are to acquire a comprehensive understanding of the characteristics of the Floridan Aquifer system, its ability to support ASR as envisioned in the CERP, and to identify any limitations to applying full scale ASR. With this information, optimum implementation of regional ASR can be determined.
ASR Informational Video (6 minutes)
Related Links & Project Documents:
- View the ASR Groundwater Model Calibration Report
(Feb 2011) - View the ASR Interim Report (June 2008)
- View the project management plan
- View the fact sheet on Aquifer Storage & Recovery
- View the current project status report (PDF)
- ASR Regional Study Reference List Lookup Website (more info below)
- View the ASR project
document page which provides a central listing of all shared documents associated with the following CERP ASR studies and projects:
ASR Regional Study
Caloosahatchee River (C-43) Basin ASR Pilot
Hillsboro ASR Pilot
Lake Okeechobee ASR Pilot.
ASR Regional Study Reference List Lookup Website
Search the ASR Regional Study Reference List Lookup website for a searchable index of a compilation of key documents related to the ASR program. Please note the ASR Lookup website is outside of everglagesplan.org. If you have any issues accessing the site, please contact the webmaster Parrish Martin at Parrish.J.Martin@usace.army.mil.
Project Contacts:
U.S. Army Corps of Engineers:
Orlando Ramos-Gines, Project Manager
Orlando.Ramos-Gines@usace.army.mil
Sponsor:
Bob Verrastro, Project Manager
bverras@sfwmd.gov
Project Details:
| Project Sponsor: | South Florida Water Management District |
|---|---|
| Project Schedule: | For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP). |
| Project Phase: | Planning |
| Design Agreement: | 12 May 2000 |
| CERP Component Designation: | N/A |
| Project Cooperation Agreement: | |
| Authorization: | Not currently authorized |



