CERP Project:
Site 1 Impoundment


What's New - Site 1 Impoundment :

Sign up for the Site 1 Newsletter!Current Issue

 

 

Videos

VIDEO: Site 1 Impoundment Project (Fran Reich Preserve)

Learn about the Site 1 Impoundment Project, part of the Comprehensive Everglades Restoration Plan (CERP), in southwest Palm Beach County.

VIDEO: Site 1 Impoundment Project: In their own words

Partners and stakeholders talk about the importance of the Site 1 Impoundment Project to the Everglades restoration effort.

Project Info

Site 1 MapThe purpose of this project is to supplement water deliveries to the Hillsboro Canal by capturing and storing excess water currently discharged to the Intracoastal Waterway. These supplemental deliveries will reduce demands on Lake Okeechobee and the Loxahatchee National Wildlife Refuge. The impoundment pool will also provide groundwater recharge, reduce seepage from adjacent natural areas, and prevent saltwater intrusion by releasing impounded water back to the Hillsboro Canal when conditions dictate. Some measure of flood mitigation may also be provided along with water quality improvement.

The selected plan includes an 1,800-acre project footprint with a 1,660-acre, approximately 8 foot deep, above-ground impoundment (13,280 acre-feet capacity) with an inflow pump station, discharge gated culvert, emergency overflow spillway, and seepage control canal with associated structures. Water from the Hillsboro Canal will be pumped into the reservoir during the wet season or periods when excess water is available and released back to help maintain canal stages during the dry season.

101910__0004_aerial
 
  • 101910__0004_aerial
    Fran Reich Preserve/ Site 1 Impoundment Project Area
  • 101910__0003_lox-gator
    Drinking water supplies and the natural ecosystem both benefit from the restoration efforts.
  • 101910__0002_hillsboro-canal
    Water currently discharged to the Hillsboro Canal will be available for use during the dry season.
  • 101910__0001_L40-side
    Phase One includes modifications to an existing levee and construction of a six-acre wildlife wetland area.
  • 101910__0000_i40-side
    Benefits include reduction of natural seepage and water demands on the Loxahatchee National Wildlife Refuge.

Related Links & Project Documents:

Project Contacts:

U.S. Army Corps of Engineers:

Stephen Baisden, Project Manager
stephen.a.baisden@usace.army.mil

Sponsor:

Robin Deaton, Project Liaison/Design Project Manager
rdeaton@sfwmd.gov

Jeff Needle, Planning Project Manager/CERP Project Manager
jneedle@sfwmd.gov

Project Details:

Project Sponsor: South Florida Water Management District
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
Project Phase: Pre-Construction, Engineering and Design
Design Agreement: 12 May 2000
CERP Component Designation: M Part 1
Project Cooperation Agreement:  
Authorization: WRDA 2007

 

 