Homepage
Programs Projects
Homepage CERP Projects Feasibility Studies Public Meetings Non-CERP Projects
     
 
Projects > Strazzulla Wetlands

Strazzulla Wetlands
headline dots

dots

Project Managers

U.S. Army Corps of Engineers Project Manager:
Michael Rogalski
michael.b.rogalski@usace.army.mil

Sponsor Project Manager:
Kathy Collins
kcollin@sfwmd.gov

dots
Related Links
dots

Project Details

Project Sponsor: South Florida Water Management District
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
*Project Region: Central
Project Phase: Pre-Construction, Engineering and Design
Design Agreement: 12 May 2000
CERP Component Designation: OPE
Project Cooperation Agreement:
Authorization: Section 601(c)(3) of WRDA 2000 (Additional Program Authority)
dots

Project Description

This separable element includes water control structures and the acquisition of 3,335 acres located in Palm Beach County.

The purpose of this separable element is to provide a hydrological and ecological connection to the Loxahatchee National Wildlife Refuge and expand the spatial extent of protected natural areas.

This land will act as a buffer between higher water stages to the west and lands to the east that must be drained. This increase in spatial extent will provide vital habitat connectivity for species that require large unfragmented tracts of land for survival. It also contains the only remaining cypress habitat in the eastern Everglades and one of the few remaining sawgrass marshes adjacent to the coastal ridge. This is a unique and endangered habitat that must be protected. This area provides an essential Everglades landscape heterogeneity function.

dots

     
 
home  contact us   privacy & disclaimer   glossary   search