CERP Project:
C-43 Aquifer Storage and Recovery Pilot
A pilot project is necessary to evaluate and reduce the technical and regulatory uncertainties of implementing the full-scale Caloosahatchee ASR Project. The pilot will identify the most suitable sites for the aquifer storage and recovery wells near the reservoir and determine the optimum configuration of those wells. It will provide information regarding the characteristics of the aquifer system within the Caloosahatchee River Basin as well as determine the hydro-geological and geotechnical characteristics of the upper Floridan Aquifer. The pilot will also determine the specific water quality characteristics of waters to be injected and the water quality characteristics and the amount of water to be recovered from the receiving aquifer.
The pilot includes the construction of one five-million gallons per day ASR well and associated monitoring wells and surface facilities. The project was refined to include information regarding the hydro-geological and geotechnical characteristics of the Hawthorn Aquifer.
Related Links & Project Documents:
- View the project management plan
- View the ASR Interim Report (June 2008)
- Information about the ASR Regional Study
- View the Final PPDR & FEIS for ASR Pilot Projects (Oct 2004)
- View the ASR project
document page which provides a central listing of all shared documents associated with the following CERP ASR studies and projects:
ASR Regional Study
Caloosahatchee River (C-43) Basin ASR Pilot
Hillsboro ASR Pilot
Lake Okeechobee ASR Pilot.
ASR Informational Video (6 minutes)
Project Contacts:
U.S. Army Corps of Engineers:
Orlando Ramos-Hines, Project Manager
Orlando.Ramos-Hines@usace.army.mil
Sponsor:
Bob Verrastro, Lead Hydrologist
bverras@sfwmd.gov
Project Details:
| Project Sponsor: | South Florida Water Management District |
|---|---|
| Project Schedule: | For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP). |
| Project Phase: | Installation and Testing |
| Design Agreement: | 12 May 2000 |
| CERP Component Designation: | Pilot |
| Project Cooperation Agreement: | |
| Authorization: | WRDA 2000 (Authorized Pilot); WRDA 2007 (amended) |



