CERP Project:
Florida Keys Tidal Restoration

share:

Since the Restudy, various studies and other projects have refined this project's scope. This project will provide for the removal of approximately 0.6 miles of impediments and will restore an historic flow way between the Atlantic Ocean and the Gulf of Mexico which was blocked during the construction of US Highway 1. An existing tidal creek restoration project near the proposed restoration project was fully successful.

One tidal creek near Marathon, Florida has been selected for restoration. Culverts to maximize flow will be located, sized, and placed under U.S. 1 between Fat Deer Key and Long Point Key (MM56) to allow tidal exchange and flushing. Monitoring of water quality, benthic community composition, and sediment particle size will be performed before construction, at six months, and one year after construction completion. Additional tidal flow way restoration projects will be subsequently identified based upon the results.

Related Links & Project Documents:

Project Contacts:

U.S. Army Corps of Engineers:

Pauline Acosta, Section Chief
Pauline.M.Acosta@usace.army.mil

Sponsor:

Dewey Worth, Project Manager
dworth@sfwmd.gov

Project Details:

Project Sponsor: South Florida Water Management District
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
Project Phase: Pre-Construction, Engineering and Design
Design Agreement: 12 May 2000
CERP Component Designation: OPE
Project Cooperation Agreement:  
Authorization: WRDA 2000 (Programmatic Authority)

 

 