|
|
| Projects
>
Central Lake Belt Storage Area
Central Lake Belt Storage Area

 |
Project Managers
No designee at this time
|
 |
Project Details
| Project Sponsor: |
| Project Schedule: |
| *Project Region: |
| Project Phase: |
| Design Agreement: |
| CERP Component Designation: |
| Project Cooperation
Agreement: |
| Authorization: |
|
 |
Project Description
This project includes pumps, water control structures, a stormwater treatment area, and a combination above ground and in-ground storage reservoir with a total storage capacity of approximately 190,000 acre-feet located in Miami-Dade County. The initial design of the reservoir assumed 5,200 acres with water levels fluctuating from 16 feet above grade to 20 feet below grade. A subterranean seepage barrier will be constructed around the perimeter to enable drawdown during dry periods and to prevent seepage losses. A pilot test of this technology will be conducted prior to final design of this component to determine construction technologies, storage efficiencies, impacts upon local hydrology, and water quality effects. Since this facility is to be located within the protection area of Miami-Dade County?s Northwest Wellfield, the pilot test will also be designed to identify and address potential impacts to the County?s wellfield which may occur during construction and/or operation. The stormwater treatment area was assumed to be 640 acres with the water level fluctuating up to 4 feet above grade. The final size, depth and configuration of these facilities will be determined through more detailed planning and design.
The purpose of the project is to store excess water from Water Conservation Areas 2 and 3 and provide environmental water supply deliveries to: 1) Northeast Shark River Slough, 2) Water Conservation Area 3B, and 3) to Biscayne Bay, in that order, if available. Due to the source of the water (Water Conservation Areas 2 and 3), it is assumed that water stored in this facility is of adequate quality to return to the Everglades Protection Area and Biscayne Bay; however, the final size, depth and configuration of these facilities, including treatment requirements, will be determined through more detailed planning and design.
Excess water from Water Conservation Areas 2 and 3 will be diverted into the L-37, L-33, and L-30 borrow canals, which run along the eastern boundaries of the Water Conservation Areas, and pumped into the Central Lake Belt Storage Area. Water supply deliveries will be pumped through a stormwater treatment area prior to discharge to the Everglades via the L-30 borrow canal and a reconfigured L-31N borrow canal. If available, deliveries will be directed to Biscayne Bay through the Snapper Creek Canal at Florida?s Turnpike. A structure will be provided on the Snapper Creek Canal to provide regional system deliveries when water from the Central Lake Belt Storage Area is not available. |
 |
|
|