The purpose of the feature is to store excess water from Water Conservation Areas 2 and 3 and to provide environmental water supply deliveries to: (1) Northeast Shark River Slough, (2) Water Conservation Area 3B, and (3) to Biscayne Bay, in that order, if available. It is assumed that water diverted from WCAs 2 and 3 is of adequate quality to return to the Everglades Protection Area and Biscayne Bay. Final configurations and treatment requirements were to come from a Water Preserve Areas Feasibility Study. Though drafted, the study scope became too large, so projects are being revisited separately.
Project Contacts:
U.S. Army Corps of Engineers:
Pauline Acosta, Section Chief
Pauline.M.Acosta@usace.army.mil
Sponsor:
Project Details:
| Project Sponsor: | South Florida Water Management District |
|---|---|
| Project Schedule: | For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP). |
| Project Phase: | Pre-Construction, Engineering and Design |
| Design Agreement: | 12 May 2000 |
| CERP Component Designation: | |
| Project Cooperation Agreement: | |
| Authorization: | Not currently authorized |