|
|
| Projects
>
Broward County Secondary Canal System
Broward County Secondary Canal System

 |
Project Managers
Kim Brooks-Hall
Kimberly.Brooks-Hall@usace.army.mil
|
 |
Project Details
| Project Sponsor: |
| Project Schedule: |
| *Project Region: |
| Project Phase: |
| Design Agreement: |
| CERP Component Designation: |
| Project Cooperation
Agreement: |
| Authorization: |
|
 |
Project Description
The purpose of this project is to reduce water shortages in the local wellfields and stabilize saltwater interface. This will be accomplished by pumping excess water from C-9, C-12 and C-13 Canal Basins into the coastal canal systems in order to maintain canal stages at optimum levels. To maintain these stages, water will be drawn from other sources such as Site 1 Impoundment and North Lake Belt Storage Area, Lake Okeechobee and the Water Conservation Area when basin water is insufficient. This project includes a series of water control structures, pumps and canal improvements in C-9, C-12 and C-13 Canal Basins and the east basin of the North New River Canal in central and southern Broward County. |
 |
|
|