CERP Project:
Broward County Secondary Canal System
The purpose of this project is to reduce water shortages in the local wellfields and stabilize saltwater interface. This will be accomplished by pumping excess water from C-9, C-12 and C-13 Canal Basins into the coastal canal systems in order to maintain canal stages at optimum levels. To maintain these stages, water will be drawn from other sources such as Site 1 Impoundment and North Lake Belt Storage Area, Lake Okeechobee and the Water Conservation Area when basin water is insufficient. This project includes a series of water control structures, pumps and canal improvements in C-9, C-12 and C-13 Canal Basins and the east basin of the North New River Canal in central and southern Broward County.
Related Links & Project Documents:
- View all the project documents for this project
Project Contacts:
U.S. Army Corps of Engineers:
Jeff Couch, Section Chief
Jeffrey.D.Couch@usace.army.mil
Sponsor:
No designee at this time
Project Details:
| Project Sponsor: | South Florida Water Management District |
|---|---|
| Project Schedule: | For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP). |
| Project Phase: | Pre-Construction, Engineering and Design |
| Design Agreement: | 12 May 2000 |
| CERP Component Designation: | CC |
| Project Cooperation Agreement: | |
| Authorization: | WRDA 2000 (Programmatic Authority) |