CERP Project:
Modify Rotenberger Wildlife Management Area Operation Plan


Several operational components were recommended after evaluation on a regional scale using the South Florida Water Management Model, to analyze regional hydrologic effects. These new operational rules are intended to improve the timing and location of water depths within the Rotenberger Wildlife Management Area. Modification to the current operating plan for the Rotenberger Wildlife Management Area will be made to implement rain-driven operations for this area as needed. Water deliveries are made to the Rotenberger Area from Stormwater Treatment Area 5. The deliveries are assumed to be of acceptable water quality.

More detailed planning will be necessary to develop the optimum modifications to the C&SF project. Costs to implement these features were not estimated. Most measures will be implemented in association with related construction features and it is assumed costs will be borne by the appropriate affected utilities.

Related Links & Project Documents:

  • No CERP documents are currently available for this project.

Project Contacts:

U.S. Army Corps of Engineers:

No designee at this time

Sponsor:

No designee at this time

Project Details:

Project Sponsor: South Florida Water Management District
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
Project Phase: Planning; Modifications as needed
Design Agreement: 12 May 2000
CERP Component Designation: EE
Project Cooperation Agreement:  
Authorization: Not required. Implement under existing state process.

 

 