CERP Project:
Modify Holey Land Wildlife Management Area Operation Plan

Several operational components were recommended after evaluation on a regional scale using the South Florida Water Management Model, to analyze regional hydrologic effects. Water deliveries are made to Holey Land from the Rotenberger Wildlife Management Area or from Stormwater Treatment Area 3/4 if Rotenberger flows are insufficient. The deliveries are assumed to be of acceptable water quality. Modification to the current operating plan and rules for Holey Land Wildlife Management Area will be made to implement rain-driven operations for this area to improve the timing and location of water depths within this wildlife management area.

More detailed planning will be necessary to develop the optimum modifications to the C&SF project. Costs to implement these features were not estimated. Most measures will be implemented in association with related construction features and it is assumed costs will be borne by the appropriate affected utilities.

Related Links & Project Documents:

  • No CERP documents are currently available for this project.

Project Contacts:

U.S. Army Corps of Engineers:

No designee at this time

Sponsor:

No designee at this time

Project Details:

Project Sponsor: South Florida Water Management District
Project Schedule: For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).
Project Phase: Planning; Modifications as needed
Design Agreement: 12 May 2000
CERP Component Designation: DD
Project Cooperation Agreement:  
Authorization: Not required. Implement under existing state process.

 

 