Homepage
Programs Projects
Homepage CERP Projects Feasibility Studies Public Meetings Non-CERP Projects
     

 

Project Documents:
Final Pilot Project Design Report (PPDR) and Final Environmental Impact Statement (FEIS) for:
Lake Okeechobee, Hillsboro & Caloosahatchee (C-43) River ASR Pilot Projects
headline dots

PDF Help
divider line
Additional PPDR/FEIS Related Documents
divider line

Final PPDR and FEIS

This report contains a Final Pilot Project Design Report (PPDR) followed by a Final Environmental Impact Statement (FEIS) associated with the Comprehensive Everglades Restoration Plan (CERP). It references three CERP pilot projects using the Aquifer Storage and Recovery (ASR) technology -- the Lake Okeechobee ASR Pilot Project, the Hillsboro ASR Pilot Project, and the Caloosahatchee ASR Pilot Project.

The PPDR and FEIS are intended to function as a decision document for engineering options for the field pilot tests recommended by the Central and Southern Florida Project Restudy Report (July 1999), and authorized in the Water Resources Development Acts (WRDA) of 1999 and 2000. These tests are required, along with other evaluations, before the co-sponsors of the CERP program, U.S. Army Corps of Engineers (USACE) and South Florida Water Management District (SFWMD) can determine the feasibility of full-scale implementation of ASR technology proposed in the CERP.

divider line
Report Documents

arrow22 Oct 2004 - Final Pilot Project Design Report (PPDR)

* Please note large file size.

Main Report (3.5* mb, PDF)

Figures:
Figures 1.1.1 to 2.3.4 (2.4 mb, PDF)
Figures 2.4.1 to 4.4.3 (2.8 mb, PDF)
Figures 4.4.4. to 4.4.32 (1.9 mb, PDF)
Figures 4.4.33 to 8.1.1 (1.4 mb, PDF)

Appendices:
Appendix A
Summary of Validated Water Quality Data, Hillsboro ASR Pilot Project (313 kb, PDF)

Appendix B
Summary of Validated Water Quality Data, Lake Okeechobee ASR Pilot Project (493 kb, PDF)

Appendix C
Summary of Validated Water Quality Data, Caloosahatchee (C-43) River ASR Pilot Project (383 kb, PDF)

Appendix D
Aquifer Storage and Recovery Pilot Project Surface Facilities Design for the Lake Okeechobee and Hillsboro Canal Sites (CH2M HILL, October 2003). (2.7 mb, PDF)

Appendix E
Conceptual Design, Caloosahatchee ASR Pilot Project (Water Resource Solutions, August 2003). (2.0 mb, PDF)

Appendix F
Real Estate Plan (1.4 mb, PDF)

Appendix G
Hazardous Toxic or Radioactive  Waste (HTRW) (87 kb, PDF)

* Please note large file size!

arrow22 Oct 2004 - Final Environmental Impact Statement (FEIS)

Main Report (3.4* mb, PDF)

Appendices:
Appendix A
Section 404(B) Evaluation (239 kb, PDF)

Appendix B
Coastal Zone Management Consistency (306 kb, PDF)

Appendix C
Pertinent Correspondence
Part 1 (3.6* mb, PDF)
Part 2 (3.4* mb, PDF)
Part 3 (4.1* mb, PDF)
Part 4 (4.4* mb, PDF)
Part 5 (1.8 mb, PDF)

Appendix D
Fish and Wildlife Coordination Act
Part 1 (1.3 mb, PDF)
Part 2 (3.2* mb, PDF)
Part 3 (7.6* mb, PDF)
Part 4 (7.9* mb, PDF)

Appendix E
Comments Received on the Draft EIS and Responses
Part 1 (297 kb, PDF)
Part 2 (1.9 mb, PDF)
Part 3 (2.7 mb, PDF)
Part 4 (2.5 mb, PDF)
Part 5 (3.5* mb, PDF)
Part 6 (3.2* mb, PDF)
Part 7 (3.6* mb, PDF)
Part 8 (1.9* mb, PDF)
Part 9 (2.7* mb, PDF)
Part 10 (209 kb, PDF)

divider line

Point of contact for these documents:

  • Richard Dasher, 904-232-1236
  • Peter Kwaitkowski, 561-682-2547
divider line

Back to top

     
 
home  contact us   privacy & disclaimer   glossary   search