- Home
- » Projects & Studies
- » Project Documents: ASR Regional Study and Pilot Project Shared Documents
Project Documents:
Aquifer Storage & Recovery Regional Study and Pilot Project Shared Documents
This page provides a central listing of all shared documents associated with the following CERP Aquifer Storage and Recovery studies and projects:
- ASR Regional Study
- Caloosahatchee River (C-43) Basin ASR Pilot
- Hillsboro ASR Pilot
- Lake Okeechobee ASR Pilot
Download the ASR Groundwater Model Calibration Report
Feb 2011 - Final Groundwater Model Calibration Report
Aquifer Storage and Recovery Regional Modeling Study
This document presents the groundwater model setup, boundary condition development and calibration for the regional model, which will be the basis of the model evaluation of the CERP ASR plan. It further analyzes the sensitivity of the regional model to a number of parameters and discusses possible sources of error to the regional model.
- Main Report (593 kb, PDF)
- Figures (15.8 mb, PDF)
- Tables (568 kb, PDF)
- Appendix A
Phase II Groundwater Model Data Collection (209 kb, PDF) - Appendix B
Grid Resolution Study (2.8 mb, PDF) - Appendix C
Selection of Boundary Conditions (3.8 mb, PDF) - Appendix D
Pumping Data Report (1.8 mb, PDF) - Appendix E
Total Dissolved Solids (TDS) (451 kb, PDF) - Appendix F
WASH123D and SEAWAT Comparison (4.1 mb, PDF) - Appendix G
IMC Comments to Draft Report With Responses (616 kb, PDF) - Appendix H
IMC Comments to Final Report With Responses (37 kb, PDF)
Download the ASR Interim Report
- Main Document (7.3 mb, PDF)
- ASR Final Project Management Plan (2003) (link)
- C&SF Restudy Feasibility Report & EIS ( 3.7 mb, PDF)
- ASR Site Selection Suitability Index (601 kb, PDF)
- ASR Environmental Impact Statement (3.5 mb, PDF)
- ASR Pilot Project Design Report & EIS(link)
- Caloosahatchee River (C-43) PMP (link)
- Hillsboro_ASR Pilot PMP (link)
- Lake_Okeechobee ARS Pilot PMP(link) Hydrogeologic Investigation Moore Haven Site (1.8 mb, PDF)
- Hydrogeologic Investigation Port Mayaca Site (331 kb, PDF)
- Hydrogeologic Investigation Western Hillsboro Basin (2.9 mb, PDF)
- Analyses of Crosswell Seismic and Well Logs Report (2.7 mb, PDF)
- Engineering Report on the L-2 Canal Site (5.9 mb, PDF)
- Engineering Report on the Labelle Test Site (21 mb, PDF)
- Sequence-Stratigraphic Report (1.9 mb, PDF)
- Sequence-Stratigraphic Report Appendix 1 (1.2 mb, PDF)
- Sequence-Stratigraphic Report Appendix 2 (3.4 mb, PDF)
- Sequence-Stratigraphic Report Appendix 3 (411 kb, PDF)
- Sequence-Stratigraphic Report Appendix 4 (1.2 mb, PDF)
- Monitoring Well Conversion at Port Macaya (45 mb, PDF)
- A Scientific Evaluation of Potential Pressure Induced Constraints and Changes in the Floridan Aquifer System (823 kb, PDF)
- Lake Okeechobee Marine Seismic Report (5.2 mb, PDF)
- Lineament Analysis Technical Memoranda (1.8 mb, PDF)
- Seismic Reflection Data Report (244 kb, PDF)
- Benchscale Modeling Study (2.1mb, PDF)
- Groundwater Numerical Model Development Support and Data Collection Report (no appendix C) (9.6 mb, PDF)
- Geochemical Models Report (1.8 mb, PDF)
- Water Quality Cycle Tests (2.3 mb, PDF)
- Fate of Microorganisms Report (1.6 mb, PDF)
- Chapter 8
- Ecotoxicological Effects of Recovered ASR Water on Receiving Aquatic Ecosystems Phase 1 Report (3 mb, PDF)
- Environmental Monitoring Summary Report (10.6 mb, PDF)
- Assessment of Mercury_Cycling (380 kb, PDF)
- Ecological Risk Assessment (639 kb, PDF)
- Methodology for Ambient Water Quality Criteria (821 kb, PDF)
5 Jun 2008 - Aquifer Storage & Recovery (ASR) Interim Report
Supporting Documents for the ASR Interim Report:
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
ASR Project Documents
- Draft ASR Regional Study Phase I - Groundwater Modeling (6.7 mb, PDF)
19 Feb 2008 - Draft ASR Regional Study Phase I - Groundwater Modeling
- Final Modeling Literature Search Results (10 mb, PDF)
- Final ASR Benchscale Study Report (2 mb, PDF)
- Oct 2005 HQ Approval Memo for PPDR & FEIS (46 kb, PDF)
- EIS Record of Decision (427 kb, PDF)
22 Aug 2006 - ASR Regional Model Development Efforts
12 Dec 2005 - ASR PPDR Approval Memo and EIS Record of Decision
- Minutes 6-7 Nov (23 kb, PDF)
- Minutes 13-14 Nov (23 kb, PDF)
- Duke Presentation (4.3 mb, PDF)
Meeting Documents
6-7 & 13-14 Nov 2002 - ASR Regional Study Public Workshops
ASR Literature Search
Search the ASR Regional Study Reference List Lookup website. The reference list is a searchable index of a compilation of key documents related to the ASR program.
As part of the ASR Regional Study, a large literature search was completed. This literatures search developed a list of key documents related to the ASR Program. The document list is extensive and includes reports from Federal agencies, state agencies, universities, consulting engineering firms and private organizations.
The literature search compiled the various biblographic references into categories and reviewed a large portion of them. Key data descriptions and codes were utilized to separate the various references into" searchable" categories. Although it has over 1,600 separate documents, it is likely that several hundred more relevants documents could exist. It is hoped that other documents will be added to the working list and the database will be kept up-to-date during the ASR Regional Study.
If you have any issues accessing the site, please contact the webmaster Parrish Martin at Parrish.J.Martin@usace.army.mil
Related Links & Documents:
- ASR Regional Study project details
- Caloosahatchee River (C-43) Basin ASR Pilot project details
- Hillsboro ASR Pilot project details
- Lake Okeechobee ASR Pilot project details
Contact for this page:
- Orlando Ramos-Gines, USACE
Orlando.Ramos-Gines@usace.army.mil



