Project Documents:
L-31 North Seepage Management Pilot Project’s Integrated Pilot Project Design Report with Environmental Assessment (PPDR/EA)
Final
- May 2009
![]()
L-31 North Seepage Management Pilot Project’s Final Integrated Pilot PPDR/EA is available for download
Download the Final Integrated PPDR/EA
23 Nov 2009 - The Final L-31 North Seepage Management Final Integrated PPDR/EA is available for download as a complete file or by section.
View or download the complete report (32 mb, PDF)
*please note large file size.
Download by section:
- Main Report (8.1 mb, PDF)
- Appendix A (293 kb, PDF)
Real Estate - Appendix B (3.4 mb, PDF)
Value Engineering Report - Appendix C (1.2 mb, PDF)
Engineering - Appendix D (68 kb, PDF)
Water Quality Monitoring Plan - Appendix E (14 mb, PDF)
FWCA Coordination and ESA - Appendix F (5 mb, PDF)
Public and Agency Comments - Appendix G (50 kb, PDF)
Section 404(b)(1) Evaluation - Appendix H (45 kb, PDF)
Coastal Zone Management Consistency Determination - Appendix I (70 kb, PDF)
List of Scoping Letter and Draft PPDR/EA Recipients
Contact Information:
For further information about this document, please contact Michael Collis at michael.j.collis@usace.army.mil
Related Links:
- View the L-31 North Seepage Management Pilot project page



