Project Documents:
L-31 North Seepage Management Pilot Project’s Integrated Pilot Project Design Report with Environmental Assessment (PPDR/EA)
Final - May 2009

l31_icon
L-31 North Seepage Management Pilot Project’s Final Integrated Pilot PPDR/EA is available for download

Download the Final Integrated PPDR/EA

23 Nov 2009 - The Final L-31 North Seepage Management Final Integrated PPDR/EA is available for download as a complete file or by section.

View or download the complete report (32 mb, PDF)
*please note large file size.


Download by section:

  • Main Report (8.1 mb, PDF)
  • Appendix A (293 kb, PDF)
    Real Estate
  • Appendix B (3.4 mb, PDF)
    Value Engineering Report
  • Appendix C (1.2 mb, PDF)
    Engineering
  • Appendix D (68 kb, PDF)
    Water Quality Monitoring Plan
  • Appendix E (14 mb, PDF)
    FWCA Coordination and ESA
  • Appendix F (5 mb, PDF)
    Public and Agency Comments
  • Appendix G (50 kb, PDF)
    Section 404(b)(1) Evaluation
  • Appendix H (45 kb, PDF)
    Coastal Zone Management Consistency Determination
  • Appendix I (70 kb, PDF)
    List of Scoping Letter and Draft PPDR/EA Recipients

Contact Information:

For further information about this document, please contact Michael Collis at michael.j.collis@usace.army.mil

Related Links:

 

Back to Top