Biscayne Bay Coastal Wetlands
Integrated Project Implementation Report and Environmental Impact Statement
January 2012 - Final

share:


4 May 2012 | Chief of Engineers Report Signed
View or download a PDF of the Chief of Engineers Report for Biscayne Bay Coastal Wetlands Project which was signed May 2, 2012.

 

BBCW DPIR/EIS Cover Graphic The Biscayne Bay Coastal Wetlands Final Integrated Project Implementation Report (FPIR) and Environmental Impact Statement (FEIS) is available for download.

The public comment period is now closed.

Printed copies are also available for review as a reference document in three public libraries in Miami-Dade County: 1) Homestead Branch Library, Miami-Dade Public Library System, 700 N. Homestead Boulevard, Homestead, Fla. 33030; 2) Main Library, Miami-Dade Public Library System, 101 W. Flagler St., Miami, Fla. 33130; and 3) South Dade Regional Library, Miami-Dade Public Library System, 10750 S.W. 211th St., Miami, Fla. 33189.

Notice of Availability

Read the Final Notice of Availability for the Environmental Impact Statement published in the Federal Register on Jan. 6, 2012.

Download the Final PIR/EIS

6 Jan 2012 - Biscayne Bay Coastal Wetlands Project Final PIR/EIS

Volume 1 - Main Report:

 

Volume 2 - Annexes A-B:

  • Annex A (12 mb, PDF)
    FWCA & ESA Compliance
  • Annex B (13 mb, PDF)
    NEPA Information
  •  

Volume 3 Annexes C-F:

  • Annex C (6.9 mb, PDF)
    Analyses Required by WRDA 2000 and State Law
  • Annex D (1.5 mb, PDF)
    Final Project Operating Manual
  • Annex E (10 mb, PDF)
    Final Project Monitoring Plan
  • Annex F (1.5 mb, PDF)
    RECOVER Reports
  •  

Volume 4 - Appendix A:
* please note large file size

Volume 5 - Appendices B-C:

Volume 6 - Appendices D-I: