Project Documents:
Everglades Agricultural Area Storage Reservoirs Integrated Project Implementation Report (PIR)/ Environmental Impact Statement (EIS)
Revised Draft - Feb 2006
The Everglades Agricultural Area Storage Reservoirs Revised Draft PIR/EIS is available for download and public review. A 45-day public comment period was held from: 24 Feb - 10 Apr 2006. Please note the public comment period has ended.
Project Documents
Apr 2006 - Updated Draft Operating Manual
- Annex D – Updated Draft Operating Manual (153 kb, PDF)
Download the PIR/EIS Report
24 Feb 2006 - EAA Revised Draft PIR/EIS
- Main Report (2.7 mb, PDF)
Annexes
- Annex A – Draft USFWS Coordination Act Report (5.0 mb, PDF)
- Annex B– Section 404(b)(1) Evaluation (172 kb, PDF)
- Annex C – CZMA Consistency Evaluation (152 kb, PDF)
- Annex D– Draft Operating Manual (275 kb, PDF)
- Annex E – RECOVER Reports (2.7 mb, PDF)
- Annex F– Water Quality Monitoring Plan (601 kb, PDF)
- Annex G – Legislative and Statutory Requirements (2.6 mb, PDF) updated 8 Mar 2006
- Annex H - Part 1 – Pertinent Correspondence (3.8 mb, PDF)
- Annex H - Part 2 – Pertinent Correspondence (2.7 mb, PDF)
- Annex H - Part 3 – Pertinent Correspondence (2.5 mb, PDF)
Appendices:
- Appendix A - Engineering (3.0 mb, PDF)
- Appendix B - Economic and Social Considerations (766 kb, PDF)
- Appendix C - Environmental Appendix (375 kb, PDF)
- Appendix D - Recreation (235 kb, PDF)
- Appendix E - Real Estate Plan (630 kb, PDF)
- Appendix F - Draft Water Quality Assessment Report (1.4 mb, PDF)
Request printed copies or a CD copy:
Attn: Mr. Stuart McLean
U.S. Army Corps of Engineers, Jacksonville District
P.O. Box 4970
Jacksonville 32232-0019
904-232-2708
stuart.c.mclean@usace.army.mil
Further information on the project may be obtained by contacting:
- Ms. Pauline Smith, USACE, pauline.m.smith@usace.army.mil
- Mr. Matthew Morrison, SFWMD
mjmorris@sfwmd.gov



