Project Document:
Caloosahatchee River (C-43) West Basin Storage Reservoir Project Implementation Report (PIR) and Environmental Impact Statement (EIS)
Final - November 2010
The PIR was submitted to Congress in April 2011 after review by the Office of Management and Budget completed their review of the document that was submitted to them by the Assistant Secretary of the Army's office. Construction is dependent upon congressional authorization and funding.
The Caloosahatchee River (C-43) West Basin Storage Reservoir Project Final PIR/EIS is available for download. Please note the public comment period has ended.
Download the Final PIR/EIS
Nov 2010 - C-43 Final PIR and EIS
Volume 1: Main Report:
- Vol. 1 Main Report (5 mb, PDF)
Annexes:
Volume 2: Annex A
Annex A: Fish & Wildlife Coordination
Download Volume 2 Appendix A as a complete file:
- Vol. 2 Annex A - Complete (54 mb, PDF)
Please note very large file size!
Or download it by section below:
- Vol. 2 Annex A - Pages 1-152 (6.4 mb, PDF)
- Vol. 2 Annex A - Page 153 (15.2 mb, PDF)
- Vol. 2 Annex A - Page 154 (6.9 mb, PDF)
- Vol. 2 Annex A - Page 155 (6.7 mb, PDF)
- Vol. 2 Annex A - Page 156 (6.6 mb, PDF)
- Vol. 2 Annex A - Page 157 (6.3 mb, PDF)
- Vol. 2 Annex A - Pages 158-584 (7.8 mb, PDF)
Volume 3: Annexes B-F
Annex B: Nepa Information
- Vol. 3 Intro to Annexes B-F (234 kb, PDF)
- Vol. 3 Annex B (5.7 mb, PDF)
Nepa Information
Annex C: Analyses Required By WRDA 2000 and State Law Savings Clause Analyses
- Vol. 3 Annex C (5.3 mb, PDF)
Analyses Required By WRDA 2000 and State Law Savings Clause Analyses
Annexes D-F:
- Vol. 3 Annex D (2.4 mb, PDF)
Draft Operating Manual and Monitoring Plan - Vol. 3 Annex E (578 kb, PDF)
RECOVER Reports - Vol. 3 Annex F (289 kb, PDF)
Consistency Evaluations
Appendices:
Volume 4: Appendix A
Appendix A: Engineering
Download Volume 4 Appendix A as a complete file:
- Vol. 4 Appendix A - Complete (166 mb, PDF)
Please note very large file size!
Or download it by section below:
- Vol. 4 Appendix A - pages 1-517 (30 mb, PDF)
- Vol. 4 Appendix A - pages 518-526 (15 mb, PDF)
- Vol. 4 Appendix A - pages 527-528 (8.2 mb, PDF)
- Vol. 4 Appendix A - pages 529-537 (16.2 mb, PDF)
- Vol. 4 Appendix A - pages 538-541 (15.2 mb, PDF)
- Vol. 4 Appendix A - pages 549-550 (8.3 mb, PDF)
- Vol. 4 Appendix A - pages 551-552 (7.6 mb, PDF)
- Vol. 4 Appendix A - pages 553-564 (16.8 mb, PDF)
- Vol. 4 Appendix A - pages 565-566 (7.8 mb, PDF)
- Vol. 4 Appendix A - pages 567-574 (8 mb, PDF)
- Vol. 4 Appendix A - pages 575-576 (8 mb, PDF)
- Vol. 4 Appendix A - pages 577-578 (7.6 mb, PDF)
- Vol. 4 Appendix A - page 579 (8.1 mb, PDF)
- Vol. 4 Appendix A - pages 580-612 (2.3 mb, PDF)
Volume 5: Appendices B-H
- Vol. 5 Appendices B-H Cover & Introduction (314 kb, PDF)
Appendix B: Cost Estimates
- Vol. 5 Appendix B (4.4 mb, PDF)
Cost Estimates
Appendix C: Environmental Information
- Vol. 5 Appendix C (8.1 mb, PDF)
Environmental Information
Appendices D-H:
- Vol. 5 Appendix D (1.2 mb, PDF)
Real Estate - Vol. 5 Appendix E (300 kb, PDF)
Agency/Public Coordination - Vol. 5 Appendix F (2.2 mb, PDF)
Plan Formulation - Vol. 5 Appendix G (2 mb, PDF)
Economic & Social Considerations - Vol. 5 Appendix H (906 kb, PDF)
Recreation
Related Links & Documents:
- View project details for this project.
- View the fact sheet on C-43 Basin Storage Reservoir
- View the project management plan (Feb 2002)
- View other project documents for this project
Contact for this PIR:
- Steve Baisden, Project Manager
Stephen.A.Baisden@usace.army.mil



