Project Document:
Caloosahatchee River (C-43) West Basin Storage Reservoir Project Implementation Report (PIR) and Environmental Impact Statement (EIS)
Final - September 2007
The Caloosahatchee River (C-43) West Basin Storage Reservoir Project Final PIR/EIS is available for download and public review. Please note the public comment period has ended.
Download the Final PIR/EIS
21 Sep 2007 - C-43 Final PIR and EIS
A high resolution version of the PIR is available on CD by request. For a CD version please contact Beth Marlowe by e-mail: beth.a.marlowe@usace.army.mil or phone: 904-232-2074.
Volume 1: Main Report:
- Front Cover (30 kb, PDF)
- Executive Summary (381 kb, PDF)
- Table of Contents (76 kb, PDF)
- Introduction (391 kb, PDF)
- Existing Conditions (1.7 mb, PDF)
- Future Conditions (184 kb, PDF)
- Identification of Problem (340 kb, PDF)
- Formulation of Alternative Plans (392 kb, PDF)
- Environmental Effects (252 kb, PDF)
- Tentatively Selected Plan (621 kb, PDF)
- Plan Implementation (108 kb, PDF)
- Project Coordination (118 kb, PDF)
- Engineer’s Recommendations (35 kb, PDF)
- Preparers of the PIR (67 kb, PDF)
- Index (32 kb, PDF)
- Glossary & Acronyms (98 kb, PDF)
- References (28 kb, PDF)
Annexes:
Volume 2: Annex A
Annex A: Fish & Wildlife Coordination
Volume 3: Annexes B-F
Annex B: Nepa Information
- Intro to Annexes B-F (188 kb, PDF)
- Annex B - part 1 (5 mb, PDF)
- Annex B - part 2 (5.1 mb, PDF)
- Annex B - part 3 (3.3 mb, PDF)
Annex C: Analyses Required By WRDA 2000 and State Law Savings Clause Analyses
- Annex C - (5.2 mb, PDF)
Annexes D-F:
- Annex D (2.7 mb, PDF)
Draft Operating Manual and Monitoring Plan - Annex E (389 kb, PDF)
RECOVER Reports - Annex F (236 kb, PDF)
Consistency Evaluations
Appendices:
Volume 4: Appendix A
Appendix A: Engineering
- Appendix A - part 1 (3.9 mb, PDF)
- Appendix A - part 2 (4.1 kb, PDF)
- Appendix A - part 3 (4.1 mb, PDF)
- Appendix A - part 4 (4.1 mb, PDF)
- Appendix A - part 5 (4.0 mb, PDF)
- Appendix A - part 6 (3.8 mb, PDF)
- Appendix A - part 7 (4.0 mb, PDF)
- Appendix A - part 8 (3.2 mb, PDF)
Volume 5: Appendices B-H
- Appendices B-H Introduction (193 kb, PDF)
Appendix B: Cost Estimates
- Appendix B (7.4 mb, PDF)
Appendix C: Environmental Information
- Appendix C - part 1 (4.1 mb, PDF)
- Appendix C - part 2 (4 mb, PDF)
- Appendix C - part 3 (4.1 mb, PDF)
- Appendix C - part 4 (3.7 mb, PDF)
Appendices D-H:
- Appendix D (1.1 mb, PDF)
Real Estate - Appendix E (135 kb, PDF)
Agency/Public Coordination - Appendix F (1.7 mb, PDF)
Plan Formulation - Appendix G (1.2 mb, PDF)
Economic & Social Considerations - Appendix H (552 kb, PDF)
Recreation
Contact for this PIR:
- Steve Baisden, Project Manager
Stephen.A.Baisden@usace.army.mil



