Homepage
Programs Projects
Homepage CERP Projects Feasibility Studies Public Meetings Non-CERP Projects
     

Project Documents:
Caloosahatchee River (C-43) West Basin Storage Reservoir Project Implementation Report (PIR) and Environmental Impact Statement (EIS)
Final - September 2007
headline dots

PDF Help

Draft PIR icon

The Caloosahatchee River (C-43) West Basin Storage Reservoir Project Final PIR/EIS is available for public review and comment. Below you may view or download the report and submit your comments.

divider line

Submit Comments
The U.S. Army Corps, Jacksonville District, is requesting public comment on the Final Project Implementation Report (PIR) and Environmental Impact Statement (EIS) on the Caloosahatchee River (C-43) West Basin Storage Reservoir Project, formerly known as the C-43 Basin Storage Reservoir - Part 1, Phase 1.

The comment period has ended.

dots

Download the Final PIR/EIS

C-43 Final PIR/EIS

arrow.gif (103 bytes)21 Sep 2007 - C-43 Final PIR and EIS
*A high resolution version of the PIR is available on CD by request. For a CD version please contact Beth Marlowe by e-mail: beth.a.marlowe@usace.army.mil or phone: 904-232-2074.

Volume 1: Main Report:
Front Cover (30 kb, PDF)
Executive Summary (381 kb, PDF)
Table of Contents (76 kb, PDF)
Introduction (391 kb, PDF)
Existing Conditions (1.7 mb, PDF)
Future Conditions (184 kb, PDF)
Identification of Problem (340 kb, PDF)
Formulation of Alternative Plans (392 kb, PDF)
Environmental Effects (252 kb, PDF)
Tentatively Selected Plan (621 kb, PDF)
Plan Implementation (108 kb, PDF)
Project Coordination (118 kb, PDF)
Engineer's Recommendations (35 kb, PDF)
Preparers of the PIR (67 kb, PDF)
Index (32 kb, PDF)
Glossary & Acronyms (98 kb, PDF)
References (28 kb, PDF)

Annexes:

Volume 2: Annex A
Annex A: Fish & Wildlife Coordination
Annex A - Part 1 (6.4 mb, PDF)
Annex A - Part 2 (6.6 mb, PDF)
Annex A - Part 3 (6.8 mb, PDF)

Volume 3: Annexes B-F
Annex B: Nepa Information
Intro to Annexes B-F (188 kb, PDF)
Annex B - part 1 (5 mb, PDF)
Annex B - part 2 (5.1 mb, PDF)
Annex B - part 3 (3.3 mb, PDF)

Annex C: Analyses Required By WRDA 2000 and State Law Savings Clause Analyses
Annex C - (5.2 mb, PDF)

Annexes D-F:
Annex D (2.7 mb, PDF)
Draft Operating Manual and Monitoring Plan
Annex E (389 kb, PDF)
RECOVER Reports
Annex F (236 kb, PDF)
Consistency Evaluations

Appendices:

Volume 4: Appendix A
Appendix A: Engineering
Appendix A - part 1 (3.9 mb, PDF)
Appendix A - part 2 (4.1 kb, PDF)
Appendix A - part 3 (4.1 mb, PDF)
Appendix A - part 4 (4.1 mb, PDF)
Appendix A - part 5 (4.0 mb, PDF)
Appendix A - part 6 (3.8 mb, PDF)
Appendix A - part 7 (4.0 mb, PDF)
Appendix A - part 8 (3.2 mb, PDF)

Volume 5: Appendices B-H
Appendices B-H Introduction (193 kb, PDF)
Appendix B: Cost Estimates
Appendix B (7.4 mb, PDF)

Appendix C: Environmental Information
Appendix C - part 1 (4.1 mb, PDF)
Appendix C - part 2 (4 mb, PDF)
Appendix C - part 3 (4.1 mb, PDF)
Appendix C - part 4 (3.7 mb, PDF)

Appendices D-H:
Appendix D (1.1 mb, PDF)
Real Estate
Appendix E (135 kb, PDF)
Agency/Public Coordination
Appendix F (1.7 mb, PDF)
Plan Formulation
Appendix G (1.2 mb, PDF)
Economic & Social Considerations
Appendix H (552 kb, PDF)
Recreation

divider line

Contact for this PIR:

divider line

Back to top

     
 
home  contact us   privacy & disclaimer   glossary   search