Project Document:
Caloosahatchee River (C-43) West Basin Storage Reservoir Project Implementation Report (PIR) and Environmental Impact Statement (EIS)
Final - November 2010


Draft PIR iconThe PIR was submitted to Congress in April 2011 after review by the Office of Management and Budget completed their review of the document that was submitted to them by the Assistant Secretary of the Army's office. Construction is dependent upon congressional authorization and funding.

The Caloosahatchee River (C-43) West Basin Storage Reservoir Project Final PIR/EIS is available for download. Please note the public comment period has ended.

Download the Final PIR/EIS

Nov 2010 - C-43 Final PIR and EIS

Volume 1: Main Report:

Annexes:

Volume 2: Annex A
Annex A: Fish & Wildlife Coordination

Download Volume 2 Appendix A as a complete file:

Or download it by section below:

Volume 3: Annexes B-F
Annex B: Nepa Information

Annex C: Analyses Required By WRDA 2000 and State Law Savings Clause Analyses

  • Vol. 3 Annex C (5.3 mb, PDF)
    Analyses Required By WRDA 2000 and State Law Savings Clause Analyses

Annexes D-F:

Appendices:

Volume 4: Appendix A
Appendix A: Engineering

Download Volume 4 Appendix A as a complete file:

Or download it by section below:

Volume 5: Appendices B-H

Appendix B: Cost Estimates

Appendix C: Environmental Information

Appendices D-H:

Related Links & Documents:

Contact for this PIR:

 

Back to Top