Non-CERP Project:
Everglades Restoration Transition Plan (ERTP) Environmental Impact Statement (EIS)
Draft - March 2011
The Everglades Restoration Transition Plan (ERTP) Draft EIS is available for download and public comment. A public meeting on the Draft EIS was held on March 24, 2011. The purpose of this meeting was to give all interested individuals, groups and agencies an opportunity to comment and ask questions on the ERTP Draft EIS.
Please note this project is non-CERP (Modified Water Deliveries)
Submit Comments
The comment period has ended.
More Information:
If you require further information about this document, please contact Gina Ralph by telephone at (904) 232-2336.
Download the Draft EIS
Mar 2011 - Everglades Restoration Transition Plan Draft EIS
- Main Body (6.6 mb, PDF)
- Appendix A (1.2 kb, PDF)
Engineering - Appendix B (6.5 mb, PDF)
Ecological Analyses - Appendix C (1 mb, PDF)
Water Quality Analysis - Appendix D (10 mb, PDF)
Pertinent Correspondence - Appendix E (10 mb, PDF)
USACE Biological Assessment - Appendix F (13 mb, PDF)
USFWS Biological Opinion - Appendix G (202 kb, PDF)
Coastal Zone Management Consistency - Appendix H (6.6 mb, PDF)
Draft Monitoring Plan
Volume 1 - Main Document:
Volume 2 - Appendices A-C:
Volume 3 - Appendices D-H:
Contact for this page:
- Donna S. George, USACE
Donna.S.George@usace.army.mil



