Home ""
General Information Programs Projects
Program Management Program Documents & Guidance RECOVER
Home
     

 

Florida Bay / Florida Keys Feasibility Study
Project Management Plan (PMP)
Feb 2002 - Final

The purpose of this Project Management Plan (PMP) is to establish the scope, define a schedule, and determine costs associated with conducting the FB&FK FS. This PMP documents the assumptions, work tasks, products, and level of detail necessary to define the natural pre-development system, existing, and future "without project" conditions; to formulate a range of alternative plans; to assess the effects of the alternative plans; and to present a clear rationale for project features selected for implementation.

The PMP acts as a general guide for the FB&FK FS. Specific alternatives, performance measures, restoration targets and implementation goals will be determined during the feasibility phase resulting in project implementation once Congressional approval has been received.

This PMP was developed, and will be updated as necessary, by the U.S. Army Corps of Engineers (USACE) in collaboration with the non-federal sponsor, South Florida Water Management District (SFWMD), utilizing a federal, state, and tribal inter-agency Project Delivery Team (PDT).

PDF Help
divider line

arrow Feb 2002 - Project Management Plan - Final

project management planMain Document (958 kb, PDF)
Appendix A  - Scope of Work (2.1 mb, PDF)
Appendix B  - Organization Breakdown Structure (221 kb, PDF)
Appendix C - Study Cost Estimate (81 kb, PDF)
Appendix D  - Study Schedule(350 kb, PDF)
Appendix E  - Technical Rquirements & References (121 mb, PDF)